Data center developers lost 40 of 41 ballot measures nationwide
· Climate · United States
Data center developers suffered a bruising election, losing 40 of 41 ballot measures nationwide, according to Inside Climate News. In Sunbury, Ohio, a suburb of Columbus, the roughly 20 volunteers who gathered signatures, distributed yard signs and canvassed door to door for one of those measures celebrated their win at Big Walnut Grill. The results mark a rare coordinated pushback against the buildout of computing infrastructure, which has driven sharp growth in electricity demand and given local opponents a concrete way to block projects. The vote outcome gives those groups a template they can replicate in other jurisdictions.
Why it matters:Ballot-box defeats for data centers signal that local opposition is becoming a real permitting risk for the power-hungry infrastructure behind AI and cloud growth.
Key points
- The single win came from a grassroots campaign run by about 20 volunteers in Sunbury, Ohio
- The measures gave residents a direct vote on projects that sharply raise local electricity demand
- The 40 losses mark a broad nationwide pattern rather than isolated local disputes
Sources (original reporting)
More stories from this day
- COP31 warned that global warming is still unchecked as COP veterans push their case
- US regulator clears construction of four advanced reactors at Texas Dow complex
- Ohio GOP drafts bill to block coal closures as Democrats end 15-year trifecta
- Nvidia CEO Jensen Huang resigns; CFO Colette Kress named interim chief
- Nvidia shares fall after Jensen Huang resigns amid affair inquiry
- US power demand shifts to renewables as coal closures face new political hurdles