Envision and ju:niz plan 442MWh battery storage project in Bavaria

· Climate · Germany

Envision Energy and ju:niz Energy have unveiled plans to jointly develop a 442MWh battery energy storage system project in Bavaria, Germany. The project is known as Smareg 13 (Vöhringen II). The announcement adds to a growing pipeline of grid-scale battery projects in Germany, where storage is being built to absorb rising output from wind and solar and to ease pressure on the power grid. Large batteries are increasingly paired with renewable generation and traded into wholesale and balancing markets, making project size and location central to how much flexibility they can provide.

Why it matters:Grid-scale storage is the bottleneck for integrating rising renewable output, and projects like this show how battery capacity is being sited and financed in Europe's largest power market.

Key points

  • The project has a planned capacity of 442MWh.
  • It is located in Bavaria and called Smareg 13 (Vöhringen II).

Sources (original reporting)

More stories from this day