US issues first construction permit in decades for Texas SMR plant
· Energy · United States
The US Nuclear Regulatory Commission approved a joint application from X-energy and Dow Chemical to build four Xe-100 advanced reactors at Dow's Seadrift site in Texas. The permit is the first construction approval for a high-temperature gas-cooled reactor in the United States in nearly 60 years. The Xe-100 is a small modular reactor design, and the project pairs a reactor developer with a large industrial chemicals user seeking on-site power. For a sector that has waited years for regulatory precedent on advanced designs, the decision gives the SMR pipeline a concrete licensing milestone and a template other industrial decarbonization projects may follow. Construction can now move toward the build phase, though operation will require further licensing steps.
Why it matters:The permit establishes a regulatory precedent for advanced reactor licensing in the US, and the industrial-owner model could shape how energy-hungry manufacturers secure on-site power.
Key points
- Four Xe-100 units are planned at Dow's Seadrift site in Texas.
- The NRC called it the first construction permit for a high-temperature gas-cooled reactor in the US in nearly 60 years.
- X-energy is the reactor developer; Dow is the industrial host.
Sources (original reporting)
More stories from this day
- NRG agrees to sell six gas plants to LS Power for $4bn
- GE Vernova to spend $34.5M expanding Louisiana transformer plant
- Solar, storage firms press Congress on permitting reform bill
- Nvidia board hires Wachtell for independent probe of CEO Huang
- Treasury Yield Nears 5% as Hot Inflation Fuels Fed Rate-Hike Bets
- Oil slides to August low as peace hopes build; US gasoline drops below $4